Issue changing frame rate by nesting comps
Hi,
This should be really simple in AE so I'm trying to figure out what the issue is here. I have .mov video footage that is 30fps. I want to slow down the frame rate to 12 fps because I am using the video as reference for stop motion animating a lip sync. The original footage is 30 fps. I created a 30 fps comp using the footage. Then, I created a new comp at 12 fps and dragged the 30fps comp into the 12 fps comp. The result is video and audio are super sped up. I had someone else do the exact same thing on a different computer and it worked fine, leaving the video the same length and speed just making it super choppy at 12fps. They sent me their file and on my computer, it was sped up. I've restarted my computer, uninstalled and reinstalled AE. Help!

