i have put the following simplified notation into a PDF i am building but when i change the number in Roadway Area field the calculation doesnt change until i go in to edit the form and go into the text field, then open the simplified notation then back out.
Simplified notation i am using: (RoadwayArea)*.025*2.4
Just cant figure out how to fix it
It is, but not in the order it should be. Currently the value of AsphaltLevelCourse is calculated before that of RoadwayArea, which is way it's not working correctly. To fix it go to Prepare Form mode, then More - Set Fields Calculation Order.
Copy link to clipboard
Copied
The fields calculation order is incorrect.
Copy link to clipboard
Copied
what would be the correct field calcualation order?
Copy link to clipboard
Copied
First RoadwayArea, then AsphaltLevelCourse.
Copy link to clipboard
Copied
The simplified notation i need to populate the asphalt level course field is the calculation of the Roadway area field *.025*2.4 which will give me the total asphalt level course and it should change according to what is calculated in the Roadway area field. That is the issue i am having
Copy link to clipboard
Copied
It is, but not in the order it should be. Currently the value of AsphaltLevelCourse is calculated before that of RoadwayArea, which is way it's not working correctly. To fix it go to Prepare Form mode, then More - Set Fields Calculation Order.