Copy link to clipboard
Copied
As I know. Each anchor point have order value. How change order value of anchor points in adobe illustrator?
{Renamed by MOD}
Copy link to clipboard
Copied
Paths have a direction.
You can revert it by clicking on the desired endpoint with the pen tool.
Copy link to clipboard
Copied
Yes, but I would like to assign one of points as the first. In the future I would use it at Adobe AE. For morphing effect.
Copy link to clipboard
Copied
Sorry.
I'm not good at spoken english.
Copy link to clipboard
Copied
So it's a closed path?
You could try and cut it open at the desired location and then join the endpoints again.
Copy link to clipboard
Copied
Thanks. I will try
Copy link to clipboard
Copied
Be careful, anchor points order depends if you create pathItem by scripting or using Illustrator tool.
Copy link to clipboard
Copied
I am using illustrator tool but I can't control order value of anchor point.
Copy link to clipboard
Copied
Salut!
J'ai édité un script qui permet de choisir le point p0,
il affiche l'ordre des points afin de pouvoir choisir le nouveau point p0,
il permet aussi d'inverser le tarcé.
Les message sont en fr: en: et de:
je l'utise également pour afficher l'ordre des points à demeure, bouton Annuler
Si intéressé me contacter par message voir profil.
René
Copy link to clipboard
Copied
It is great. I need this script, please.
Copy link to clipboard
Copied
How can i get this script?
Copy link to clipboard
Copied
This seemed like good practice so I've written one this morning:
/**
* SetPath.jsx
*
* When the user selects a single anchorpoint of a single shape, this script will mimick a "Set First Vertex"
* menu action in After Effects along with adding "Reverse Path Direction" support either via prompt or config.
*/
var config = {
reverse: {
showPrompt: false, // If true, asks whether you want to reverse
value: false, // If true, will reverse paths. This is overridden whenever showPrompt above is set to true
title: "Reverse?", // Title of the window
message: "Choose yes if wanting to reverse path direction:", // Description of window
},
showAlert: true, // If true, displays an alert on completion
message: "Done!", // Contents of the alert on completion
//
// Various debugging utilities for catching errors and edgecases:
debug: {
alertSelectedAnchor: false, // if true, alert with original selected point index
reportNewAnchors: false, // if true, alert string of indices to rewrite as
endBeforeRunning: false, // if true, ends function before any modifications
},
};
//
var shouldReverse = false; // Needed as a global variable
Array.prototype.filter = function (callback) {
var filtered = [];
for (var i = 0; i < this.length; i++)
if (callback(this[i], i, this)) filtered.push(this[i]);
return filtered;
};
Array.prototype.setNewOrigin = function (index) {
if (index > this.length || index < 0) return this;
return [].concat(this.slice(index), this.slice(0, index));
};
Array.prototype.findIndex = function (callback) {
for (var i = 0; i < this.length; i++)
if (callback(this[i], i, this)) return i;
return -1;
};
Array.prototype.forEach = function (callback) {
for (var i = 0; i < this.length; i++) callback(this[i], i, this);
};
Array.prototype.map = function (callback) {
var mappedParam = [];
for (var i = 0; i < this.length; i++)
mappedParam.push(callback(this[i], i, this));
return mappedParam;
};
function get(type, parent) {
if (arguments.length == 1 || !parent) parent = app.activeDocument;
var result = [];
if (!parent[type]) return [];
for (var i = 0; i < parent[type].length; i++) result.push(parent[type][i]);
return result;
}
// Utility function that checks to ensure only one vertex is active and returns it if so
function hasSinglePointSelection(item) {
function findActiveVertices(item) {
return get("pathPoints", item)
.map(function (point, index) {
return {
index: index,
point: point,
};
})
.filter(function (item) {
return item.point.selected == PathPointSelection.ANCHORPOINT;
});
}
var selectedPoints = findActiveVertices(item);
if (!selectedPoints.length) return false;
else return selectedPoints.length == 1 ? selectedPoints[0] : false;
}
function main() {
// First grab selection
var selection = get("selection");
// But ensure only one object is selected:
if (!selection.length || selection.length > 1)
return alert("Must have a selection and only one path selected");
// Isolate our target shape and ensure it's the correct type:
var target = selection[0];
if (!/path/i.test(target.typename) || /compound/i.test(target.typename))
return alert("Selection must be a valid PathItem and not a compound path");
// Ensure only one anchor has been selected so we know our intended origin:
var chosenVertex = hasSinglePointSelection(target);
if (!chosenVertex) return alert("Must have only one vertex selected");
var newOriginIndex = chosenVertex.index;
if (config.debug.alertSelectedAnchor) alert(newOriginIndex);
// Since PathPoint is a ref and mutable, we need to shallow copy it to rearrange the entire set:
var points = get("pathPoints", target)
.map(function (point, index) {
return {
index: index,
data: shallowCopy(point),
};
})
// And use a shorthand utility for setting the new index as the first vertex:
.setNewOrigin(newOriginIndex);
// Very basic UI to flip path direction via confirm dialog:
shouldReverse = config.reverse.value;
if (config.reverse.showPrompt)
shouldReverse = confirm(
config.reverse.message,
!config.reverse.value,
config.reverse.title
);
if (shouldReverse) {
// We can't simply reverse an array like [0,1,2,3] if 0 is our selection because then it becomes [3,2,1,0]:
points = points.reverse();
// We have to set the new origin of the reversed array back to the new origin, like [0,3,2,1]
points = points.setNewOrigin(
points.findIndex(function (point) {
return point.index == newOriginIndex; // So we use an ES6-like array method of findIndex
})
);
}
// This just reports a list of anchors like [2,3,0,1] in case anything weird is happening:
if (config.debug.reportNewAnchors) {
var str = "";
str += points
.map(function (point) {
return point.index;
})
.join(",");
alert(str);
}
if (config.debug.endBeforeRunning) return null;
// So for each point, we rewrite it with shallow copy values:
get("pathPoints", target).forEach(function (point, index) {
rewritePoint(point, points[index].data, index);
});
// Then we have to manually clear the selection, because for some reason AI deselects the entire object if you toggle point selections too much:
get("pathPoints", target).forEach(function (point, index) {
point.selected = PathPointSelection.NOSELECTION;
});
// And manually reselect the first vertex, which should correspond to the original selected vertex we'd wanted to set as First Vertex before running the script
target.pathPoints[0].selected = PathPointSelection.ANCHORPOINT;
if (config.showAlert) alert(config.message);
}
function shallowCopy(ref) {
var temp = {};
for (var key in ref) temp[key] = ref[key];
return temp;
}
function rewritePoint(a, b, index) {
var keys = ["anchor", "leftDirection", "rightDirection"];
keys.forEach(function (key) {
var tempKey = key + "";
// If we reverse directions, then we have to set leftDirection > rightDirection and vice versa otherwise we produce artifacts:
if (/direction/i.test(key) && shouldReverse && b[key])
tempKey =
key.replace("Direction", "") == "right"
? "leftDirection"
: "rightDirection";
a[tempKey] = b[key];
});
}
main();
Unlike the one shown above, this works based on user selection. If you select an anchor of a shape then run this script it will mimick a Set First Vertex action of After Effects without creating new annotation text or requiring you to know the point index in order to type it into a prompt, reversing the path is optional and can be set to default (or set to prompt you) in the config variable at the top:
Copy link to clipboard
Copied
Hi there,
Thanks for reaching out. I hope your issue is resolved by now. We'd appreciate if you can mark the appropriate response correct. If you used any other method, you may share it with us here. It'll help other users with similar concern.
If you still have issues, you may share the concern. We'll be happy to help.
Regards,
Ashutosh