Copy link to clipboard
Copied
Hi everyone!
I've got a clip with a moving background and I have speeded it up to 400% so that it's accurate speed with the other objects I have in the video. I now have one problem: I don't want to cut some clips to make one clip e.g. 300%, the next one 200% etc.
Is there a way in Premiere pro that I can make the moving video (where I've put the speed to 400%) constantly slower so that e.g. in like 2 seconds it goes from 400% to 0%? 🙂
Thanks a lot!!
Alex
Copy link to clipboard
Copied
Yes. It's called Time Remapping.
See here:
https://helpx.adobe.com/no/premiere-pro/using/duration-speed.html
and here:
https://helpx.adobe.com/after-effects/using/time-stretching-time-remapping.html