Copy link to clipboard
Copied
Hi-
I am hoping this is an easy answer. I have been instructed to time my sequences which have been edited in 23.98 as 29.97. Do i simply drop my 23.98 sequence into a 29.97 sequence and use that time?...Or is there some sort of calculator that can do this?
Copy link to clipboard
Copied
Duplicate the sequence, then in the dupe, change the frame-rate in Sequence settings, and see what you get.
Going one way between them needs a "3:2 pulldown" and going the other way isn't nearly so difficult to get looking/timed decently. I always forget which is which. I think going 29.97->23.976 is the problem one.
Any way, give it a shot and see what happens. Fastest way to check.
Neil