Answered
Cannot change order of layers inside Repeat Grid
This problem started with the latest (December) updates to Adobe XD (now running on Windows Adobe XD version 3.1.12.2). Tested in both MacOS High Sierra and Windows 10, the layer order inside Repeat Grid -group cannot be changed by dragging layers with mouse. For other groups, symbols etc. it works as usual.
Edit: seems that layer unions have the same issue.
