Skip to main content
Timothy.Spear
Inspiring
Aug 1, 2021 6:04 PM UTC
Open for Voting

P: Change order of edit/detail icons

I do NOT follow the prescribed order from Adobe:

Edit -> Light, Color....

My normal flow is to eliminate distractions first. So I

1. Crop/Rotate.

2. Enable Camera Optics

3. Geometry

4. Then start the Adobe flow of "Edit (global) > Light, Color.....

 

It would be nice if we can change the order of the icons/panels to match how we think.

3 replies

scot.hacker
Inspiring
Jul 13, 2026 6:48 AM UTC

Came to second this. One of the things I love about Lightroom over Classic is the dominance of the Info panel in the top spot so we can control the title at a glance, see the shoot date, etc. But with the latest version, Adobe has put the “Assisted Culling Info” panel at the top. I don’t use or care about that panel. I want to keep the normal Info panel at the top. Please provide a way for us to control the order of the edit tools.

Translate
Nadeem28230335k4xr
Known Participant
Jan 1, 2024 4:23 PM UTC

In both Lightroom desktop and Lightroom Mobile, I would like the ability to rearrange the edit tool panels to suit my workflow.  I'm constantly having to scroll down and back up, then down, then back up, etc.

 

It would also be nice to split out some of the individual tools from some panels.

 

My workflow when editing:

  1. start with Detail for noise reduction, sharpening
  2. go to Optics for chromatic aberration, lens corrections, and defringing
  3. up to Profiles to set the color profile
  4. down to Color to set the white balance
  5. up to Light for tone adjustments
  6. down to Effects for texture, clarity, and dehaze
  7. back to Color for vibrance and saturation
  8. back to Light for tone curve
  9. then back to Color for color mixing, grading, and once I understand it better, point color

 

Usually I'll do local adjustments with masks, and healing after all this

Translate
Nadeem28230335k4xr
Known Participant
Jan 1, 2024 4:50 PM UTC

@Rikk Flohr: Photography just curious, but why was MacOS removed as a topic?  I mentioned this idea would be good for both desktop and mobile.  I'm new here and don't know the intricacies for posting Ideas, so want to learn.

Translate