How do I a slip edit on multiple clips at the same time?
I have a track with hundreds of clips referencing the same file. I re-linked the source file to one which is longer. However, the clips now appear to be 0:45.130 out of sync with the original edits. I was thinking I could just slip edit them, but it seems like that can only be done one clip at a time. Is that right? Is there a way to relink a track to media that is a different length while keeping the cuts from the first part of the file?
It would be great to be able to slip edit multiple clips at the same time.
