Copy link to clipboard
Copied
dotted lines vs normal
Hi
If you right click on an empty space in the graph and choose 'Clear Node thumbnails' (or press F5) the thumbnail cache is emptied and the grey dotted lines indicate that the thumbnails following along that link are not up to date.
You can can double click a node to recalculate the thumbnails up to that point or right click an empty space and choose 'Compute Node Thumbnails' to calculate them all.
(A red dotted line indicates an incompatible link e.g. a grey output connected to a colour inpu
...Right click on a graph area to add a navigation pin and Press F2 to cycle between navigation pins
Dave
Copy link to clipboard
Copied
Hi
If you right click on an empty space in the graph and choose 'Clear Node thumbnails' (or press F5) the thumbnail cache is emptied and the grey dotted lines indicate that the thumbnails following along that link are not up to date.
You can can double click a node to recalculate the thumbnails up to that point or right click an empty space and choose 'Compute Node Thumbnails' to calculate them all.
(A red dotted line indicates an incompatible link e.g. a grey output connected to a colour input)
Dave
Copy link to clipboard
Copied
hi daves.
thanks for the response, another question i have is how to go to pins directly within a graph, do i need to click something or choose which pin from a dropdown to automatically go there?
Copy link to clipboard
Copied
Right click on a graph area to add a navigation pin and Press F2 to cycle between navigation pins
Dave
Copy link to clipboard
Copied
Just what i needed, thanks Dave.
Copy link to clipboard
Copied
You're welcome 🙂
Dave
Copy link to clipboard
Copied
dave another question is it possible that the program slow down for having a LOT of nodes (10k+), meaning a lot of thumbnails to process?