P: Ability to set the default frame duration for newly added clips in the video timeline
This request comes from a forum thread where i was asking question about the new video features in cs6 and how they can bw used for animation and storyboarding. http://forums.adobe.com/thread/978719 question number (1)
At present when adding a new clip to the timeframe the default duration is set to 60 frames. It would be very helpful if that value could be set by the user. Currently if you want to animate you have to manually drag the duration of every layer by hand to a shorter value. Time consuming and rather annoying.
I imagine the logical place to put something like this would be the timeline menu. It could be called "default layer duration" and could have the option of setting a time or number of frames. A bonus feature would be to have a check box for setting the duration to "auto duration". This would set the layer duration for an newly created layer to the same length as previous one. For example, if you create a new blank layer and drag is to 15 frames the next layer you create will also be 15 frames long.
A feature like this could really speed up the storyboarding and animation workflow.
