Skip to main content
MACMC
Participating Frequently
December 8, 2022
Open for Voting

Improvement to data offered in the Production Panel

  • December 8, 2022
  • 0 replies
  • 70 views

I've just moved my small production team over to using the Productions workflow in premiere but have noticed that there is a piece of information missing from the Productions panel that would be useful to me at the point of seeing the entire Productions projects list.

 

My request would be to attach the "User name" field found in the collaboration settings to the "Date modified" collumn- for example "08/12/2022 09:00:00 (MACMC) so that you can see who was the last user to modify the file, in addition to when that is currently displayed.

 

When a project is open by another user you can see this information in the "Project Locked" collumn so the data exists. Could it be attached to the field once the project is closed by the active user, therefore being overwritten if a change was made to the project?

 

The usefulness of this to me would be seeing who was last hands on with a project and who might have been responsible for a potential issue with the project file or its contents. With the name i can go direct to that person but without it i have to go to the wider team first then have that person confirm, if that even possible as two users might think they were both the last users to access the file. 

 

Please comment below if you feel this feature would be useful to you too, or if there is a way to do this already that I've missed.