Skip to main content
Samuel Neff
Participant
January 24, 2023
In Development

Proxy workflow - interpret footage

  • January 24, 2023
  • 95 replies
  • 5177 views
Please make the "interpret footage" feature pass down from hi-res native footage to attached proxies. For example, if native camera footage is interpreted from 60fps down to 23.976fps, then the 60fps Premiere-generated proxies should be interpreted that way as well.

95 replies

Known Participant
January 24, 2023
Yes. We need this basic feature!! It's really important.
Inspiring
January 24, 2023
Yes pls
Inspiring
January 24, 2023
I'm for it.
bryantjcoffey
Participating Frequently
January 24, 2023
Would love for this to also be implemented into the feature where you link the footage to proxies already completed.
Inspiring
January 24, 2023
how is this still being ignored? The workaround on YouTube didn't work for me and this really should be something Adobe fixes.. now I have to transcode all my footage from 60 to 23.976 just to use proxies which results in an extra Terabyte of storage needed. This is absolutely ridiculous..
Inspiring
January 24, 2023
I support this feature request! Please add this as soon as possible.

Thanks to this youtube tutorial I am able to use a workaround:
https://www.youtube.com/watch?v=-b8VtZX62XA&t=700s&index=3&list=PLM94tRh-A-bBM7Z0h5tIjCZtdcjcOI6Sc
Inspiring
January 24, 2023
This seems like such an easy fix I don't even know why its taken so long. Here's the current solution that shows just how dumb this is: https://www.youtube.com/watch?v=0evKZXohM7o
Inspiring
January 24, 2023
This is currently the only thing in premiere that makes you think you are not dealing with a professional software.
Inspiring
January 24, 2023
We really need this. It's not a proxy if it has a totally different framerate than the original footage. Thank you!
Inspiring
January 24, 2023
yes please. !!