Hi There. I need help please. So I was able to successfully input the variable on my Captivate 9 material. Everything works fine. The current date shows up every time I re-open my material at different dates using captivate 9. However, after uploading it on Captivate Prime it won't give me the current date. It was showing the old date when I uploaded the material on prime. How do I fix this to show the current date on prime?

This topic is closed to new replies. Start a new post to keep the conversation going.

5 replies

Lilybiri
Legend
Nov 15, 2017 8:39 PM UTC

There was a typo in the name of the variable, have made a correction.

I will move your question to the Prime forum, looks like a better forum for this type of question.

Translate
Participant
Nov 15, 2017 8:47 PM UTC

Thank you for the swift response. I manually typed it after copying from a slide. These were the options from c9.

Translate
Lilybiri
Legend
Nov 15, 2017 10:23 PM UTC

You did write this: cpInforCurrentDateString

You can download a complete explanatory table with all system variables from my blog post:

System variables in Captivate 8/9 and 2017 - Captivate blog