import videos and place based on length
I work with my team in the area of video automation / video personalization. We create videos for events that have 1000+ guests and each of them will get a personalized video to go home with. That's usually no problem when changing text sources to place names, venues and so on.
Lately we planned to include videos created on location and render them into the project. That's where the problems really started:
- we were faced with different lengths of on-location clips
- these clips needed to be placed in the middle of the final video
We did a workaround that splitted up the whole thing: Rendering the first part with personalized content (names, etc.) - no problem. We then rendered the on-location part with some overlays. Finally we had the last part, again with regular text changes (names, etc.). Now we needed to stitch them together. That's where we really could use a good idea.
Finally my question:
Is it possible to stitch videos based on their length? Best would be a possibility to tell AE to place videos one after another and link different audio tracks on the depending video part. Because of the various lengths the audio wouldn't link anymore in the last part if the middle part is too long.
I hope, I could describe what's on my mind and maybe there are some pros out there that know a simple solution!
Hardware/Software we use:
- Usually we render the videos on multiple virtual machines (based on the number of clips needed for an event).
- We always use the latest version of AE / Media Encoder.
