Export with In and Out frame adds 1 frame before the IN Point during export
Currently on a 24 fps Timeline at 00:02:54:20 I cannot export with In and Out with a start from there.
It always starts at 00:02:54:19, when using in and out points. So it adds 1 frame in the front.
It is probalby not related to the specific timecode.
This does not happen always sofar I cannot make out a pattern.
I am on Premiere 23.6 on win 11.
Cheers
