Long Form Project Optimisation
Hello,
I work as a Post Supervisor and Assistant Editor and I am looking for a real guide to optimizing Premiere Pro for long form (1.5-2hours). I have read the Long Form and Episodic Workflow Guide developed by Adobe cover to cover (which was very useful), but we are still encountering significant software performance issues when our master sequence for the films become larger.
The editors are working with the latest version of PP, on Apple M1 mac studios, 64 GB ram connected to an Editshare server with 10GBps connection.
I have the media cache on a Samsung T7 Shield 1TB SSD.
Then all the media is seperated out according to Adobes specified production workflows (seperate projects for each shooting day of material, etc.)
The editors are cutting with Pro Res 422 Proxies.
It still becomes suboptimal when we start to encounter playback lag, slow actions, constant beachballing for 2-3 seconds that quickly becomes extremely inefficient and frustrating for us to edit with.
We do not work with burnt in LUTs, rather the LUTs are added to the proxies with Lumetri Color to give the editors more control, maybe that could negatively impact performance?
There are also large amounts of subtitles inside (the project is a documentary featuring some sequences in Spanish) could that also be an issue?
In any case if anyone could enlighten me on something I am missing it would be an extreme help, because I feel like I have tried everything at this point and I am starting to think editing larger productions with Premiere is much more trouble than its worth.
Thank you!
