Question
Shot in 29.97, need to convert to 23.98 for edit
Our footage frame rate is 23.98 for our project, however some footage was mistakenly shot in 29.97. We'd like to convert it back to our correct frame rate and I'm looking for recommendations on best methods to do that. I'd rather not edit with two different frame rates in one sequence, rather convert the incorrect frame rate to 23.98. Ideas for best method to do this?
