Video editing and duration issues
I have a 8 minute video, I cut out 90 % of it and ultimate had 26 sections of clipped videos of varying lengths from 1 second to 3 seconds. I want to take the clipped video segments and make the all 2 seconds long. I highlight them all and adjust the duration. However, on the clips that are 1 second long it brings back part of the video I clipped off - I don't want that to occur. I just want the 1 second clipped video to slow down to 2 seconds and the 3 second clipped video to speed up to 2 seconds (that part works great). I have tried to search for an ansser - I can't find it. Newer to Premier Pro - thanks for any help.
