Is this at all possible on media export?
Is it possible to have a default selection for exporting media when it comes to selecting Entire timeline, In/Out etc. and crucially that default would carry over to AME when using it through either Queue or dropping a timeline into the render queue via dynamic link?
I ask this because 99.999% of the time I want Entire Timeline. Most of the time I dynamically link my timelines in AME and drop a finished one in there and let it render while I start to work on the next version for the next newscast.
Last night I didn't realize I had a rouge in point about 7 seconds into a 12-second reporter stand up intro. Guess what went on air in our newscast? Yup, a 4-second intro that made no sense. The default settings for both AME and the local export suck that you cannot pick "Entire Timeline" and it will default to that if that's your jam. In news we move fast and sometimes little things that should not have any consequence on the final export like a random in-point still sitting on the timeline can literally kill a story. Even a simple checkbox next to the selector that says "Make this selection my default" and it locks it in until you need to change it would be fantastic. ANYTHING to let me lock in "Entire sequence" as my default exporting method on Premiere and Media Encoder needs to happen. And yes, I've suggested this in the little online suggestion thing that becomes the black hole of type it and nothing ever happens, so I'm hoping since people who write and tweak the code are in here a lot they can look at this and think to themselves "Hey, that's a fix that would take me 'x hours' to do" and they do it.
