Optimize Beta without risking real projects
- October 1, 2025
- 3 replies
- 204 views
I work on client projects and I want to test Beta, but not lose hours if something breaks. I propose two improvements:
1) Immediate rollback in Beta
- Each Beta update should allow installing the previous build directly (one step back, not ten; for example, let 25.6.0.002 roll back to 25.6.0.001, not jump all the way down to 25.4).
- This pinpoints exactly where the bug appears and lets us report with context.
- Benefit: Adobe gets precise feedback and we avoid blocking deliveries.
Safeguard: when rolling back one build, show a clear impact notice and an “I accept” checkbox. Any potential loss would be minimal and explicitly assumed by the user.
2) Beta ↔ Pro coexistence with controlled degradation
- Enable a safe way to open a project started in Beta in the stable version (Pro) when an update breaks a specific tool.
- Accept that new Beta features may degrade or open as read-only in Pro (for example, a new Mask tool).
- Benefit: we keep the workflow moving while still sending feedback to Adobe.
Safeguard: when opening in Pro, display a list of what will degrade or be disabled and offer options like “flatten,” “bake,” or “replace” unsupported effects, always saving a copy.
Final question:
Is it feasible to implement a one-step rollback in Beta and a safe open-in-Pro with controlled degradation? It’s a win-win: better reports for the team and less risk for professionals testing Beta on real work.
