Question

How do you change the version control source on a SP linked project?

  • August 18, 2015
  • 1 reply
  • 368 views

Our SharePoint admin recently changed the url of our SP farm and I need to change the version control source in our (multiple) RH projects. Is their a way to repoint our RH project SP connection to all the master content that is simply in a different location?

Best I've been able to do is disconnect a copy of the project and recreate the version control link from scratch (thereby removing the last couple months of versioning)

Thanks,

This topic has been closed for replies.

1 reply

Known Participant
August 18, 2015

Found where the source control location can be controlled in the .xpj file.

Using RH10 with a connection to SP2013

Fix:

- make .xpj file writable (right click, permissions, 'read only' check-box)

- open .xpj using notepad/dreamweaver etc.

- located the vc::database reference and change the value (represented as a url/path below the command) accordingly

- save file

- make .xpj read only again (for some reason when it wasn't read only it crashed out RH?)