When working on multiple projects with different frame rates it is time consuming to ensure that footage being brought in (in this case image sequences) is interpreted correctly. It currently requires manually interpreting each imported sequence if the project frame rate differs from the rate set in Preferences > Import.
More than once when jumping between projects I've failed to notice that a sequence has been interpreted at a different frame rate than intended, and needed to go back and fix later.
It would be very useful to have the option to set the default assumed frame rate on a per-project basis.
One suggestion for where it could live would be in Project Settings > Time Display Style - maybe a checkbox titled 'Match imported file sequences to project frame rate'?
Another option would be to have a checkbox in Preferences > Import to 'Use project frame rate' or similar.
This would be valuable to me as it would reduce errors when working across multiple projects with differing frame rates.