Best practices for keeping big projects from slowing down
Hey there,
I'm working on a feature doc. We've got over 250 hours of footage and are working in one big project. Our workflow includes making master sequences of the media so that every media clip is represented in a sequence. Then we additionally have many scenes that each have their own sequences (multiple versions). Our project size isn't giant (54.4 MB) but it has grown from when it started obviously. The main noticeable slow down has been that it's taking longer and longer to save.
What I'd like to know is, are there any good practices to keep the saving from taking so long. Additionally, are there other risks that I should be thinking about when working on such a large project? At the moment operating within the project runs smoothly but I do worry about that slowing down too.
Cheers
