Change from 25fps to 24FPS
I have just cut a feature length documentary at 25fps (shot in the UK) now for a DCP I need to supply at 24fps for film festivals.
I've read about the need to pitch shift the auduo and that the film will be around 4 minutes longer on the timeline due to the reduction of 1 frame every second...
HOWEVER
I've just created a new sequence at 24fps , and dropped the timeline contenta from the 25FPS sequence into this new sequence and it's the same length and (seems to) play back the same? Does Premiere now automatically handle this or am I missing something ??
