Hi everyone,

I'm currently working on a project which requires a lot of morph cuts .

I have just updated to the newest version of Premiere (and already wish I hadn't). In the old version, a morph cut would take about 15-20 second to analyse. Now, after the update, it takes about 2-3 minutes to analyse which is costing me way too much time for the 3-6 hour timelines we have with about 50 morph cuts or more.

I called the support line and the very helpful answer I got was "You just have to wait while it's analysing".

Does anyone have the same issue? Is there a fix or a way to go back to the version just before 12.0.0?

Thanks so much,


Nadine

    This topic has been closed for replies.

    2 replies

    Known Participant
    December 12, 2017

    Same thing happening here too. Just a 13 frame morph takes now 5 minutes or so to analyze and render

    Matt Young14394008
    Legend
    November 21, 2017

    I am noticing the very same symptom with the most recent update.  The analyzing time for morph cut now takes at least ten times longer than it used to take before the update.  I only use morph cut occasionally, but when I do it required a lot of adjusting to get it right...increasing or decreasing the duration by a frame here or a frame there, shifting it one or two frames in either direction to see what looks best.  With the present analyzing time required for each little change, it's essentially unusable in a real-world business sense.