Transcode Sequences with only used PORTION of clips
I'm not sure if my understanding of consolidation is skewed, or if I'm not selecting something properly. I'm trying to consolidate a project to save space. I thought that an export via Project Manager selecting "Exclude unused clips" would only save the SECTION of a clip used in the actual sequence, and not the full master clip. However, when I export such (with small handles), the export is still copying the ENTIRE master clip file. In other words, if I have a 30 minute clip and I've only used 15 seconds from that master clip, I thought such consolidation would ONLY save the video used in the sequence. Is my assumption correct, or does Premiere have to re-export the entire master file due to reformat settings selected in the 'consolidate and transcode' section?
Thanks so much.
