Matching Duration of Still Images with video clips
Hi, I'm basically putting still images on top of clips in the timeline. Different video clips each has it's own still image that goes on top of it, it's a png that works like an overlay basically so it provides info about whatever is shown in the video clip. Problem is I have many clips and matching the still image duration with the clip duration underneath it manually takes me a very VERY long time. I was wondering if there is an automated way to do this inside of PP or if you can think of a clever way around it?
