Skip to main content
affanshah
Participating Frequently
November 13, 2021
질문

Matching Duration of Still Images with video clips

  • November 13, 2021
  • 3 답변들
  • 429 조회

Hi, I'm basically putting still images on top of clips in the timeline. Different video clips each has it's own still image that goes on top of it, it's a png that works like an overlay basically so it provides info about whatever is shown in the video clip. Problem is I have many clips and matching the still image duration with the clip duration underneath it manually takes me a very VERY long time. I was wondering if there is an automated way to do this inside of PP or if you can think of a clever way around it?

이 주제는 답변이 닫혔습니다.

3 답변

Participant
June 24, 2024

Hi there, did you find the solution yet? I have the same question

Ann Bens
Community Expert
Community Expert
November 13, 2021

If they were all the same duration no problem but as they are all different...alas.

If the images are premade and sitting in the project window you can select them all, drop them in the timeline and adjust with the rolling edit tool.

affanshah
affanshah작성자
Participating Frequently
November 13, 2021

I should add, the clips are all different duration, sorry forgot to mention that