Exit
  • Global community
    • Language:
      • Deutsch
      • English
      • Español
      • Français
      • Português
  • 日本語コミュニティ
  • 한국 커뮤니티
0

Replacing clips

Participant ,
Jun 18, 2023 Jun 18, 2023

I am trying to replace in my timeline an MP4 version of a duplicate MOV clip.  Currently, when I try to do this, I click on the clip from the timeline so that it shows in the Program monitor, and I try to find the timestamp for when that clip starts (so that I can match it with the start of the new MP4 clip in the Source monitor), but I only see the timestamp relative to its place in the timeline.  

 

How can I see the timestamp for a portion of a clip that has been used in the timeline?

 

What do you suggest as an alternate method, if any?

n0n0_0-1687140854865.png

 

 

 

TOPICS
Editing
1.7K
Translate
Report
Community guidelines
Be kind and respectful, give credit to the original source of content, and search for duplicates before posting. Learn more
community guidelines

correct answers 1 Correct answer

Advocate , Jun 19, 2023 Jun 19, 2023

Ok, there are several ways to do that.

 

1. If your MOV and MP4 have the same duration and timecodes, the easiest way is to replace the clip from the bin (project panel). Locate the MOV in the project panel, right click > replace footage, and locate the MP4. All the MOV instances used in the timeline will be replaced with the MP4.

 

2. To reply to your specific question, in order to view the timecode of a certain clip on your timeline, you have two options.

     2.a. Right click on your program monit

...
Translate
Contributor ,
Jun 19, 2023 Jun 19, 2023

Hey,

If I understand correctly, you can try using the markers ?

If it's the exact same clip, base it on the duration?

Good luck

 

G.
Translate
Report
Community guidelines
Be kind and respectful, give credit to the original source of content, and search for duplicates before posting. Learn more
community guidelines
Community Expert ,
Jun 19, 2023 Jun 19, 2023

Could you use 'replace footage' in the project panel?

replace footage.png

Translate
Report
Community guidelines
Be kind and respectful, give credit to the original source of content, and search for duplicates before posting. Learn more
community guidelines
Advocate ,
Jun 19, 2023 Jun 19, 2023

Ok, there are several ways to do that.

 

1. If your MOV and MP4 have the same duration and timecodes, the easiest way is to replace the clip from the bin (project panel). Locate the MOV in the project panel, right click > replace footage, and locate the MP4. All the MOV instances used in the timeline will be replaced with the MP4.

 

2. To reply to your specific question, in order to view the timecode of a certain clip on your timeline, you have two options.

     2.a. Right click on your program monitor and check "Overlays", this will display a small box on your monitor with the timecodes specific for each track.

     2.b. If you find those Overlays intrusive, you can go to window > timecode, this will open a new panel where you can add lines to display any timecode related thingy.

 

Hope this helps.

Translate
Report
Community guidelines
Be kind and respectful, give credit to the original source of content, and search for duplicates before posting. Learn more
community guidelines
Participant ,
Jul 02, 2023 Jul 02, 2023

Holy moly - this is life-changing!!  Thank you SOOO much for all this help.  Super clear and concise.  What a time saver.  

Translate
Report
Community guidelines
Be kind and respectful, give credit to the original source of content, and search for duplicates before posting. Learn more
community guidelines
Community Expert ,
Jul 02, 2023 Jul 02, 2023

Can I ask why you are doing this? Are you doing a sort of manual Proxy workflow?

Translate
Report
Community guidelines
Be kind and respectful, give credit to the original source of content, and search for duplicates before posting. Learn more
community guidelines
Participant ,
Jul 02, 2023 Jul 02, 2023

I am newer and unsure what a manual Proxy workflow is, but my reasoning for doing this is that I was getting a watery effect on my clips and was advised to convert those clips from variable frame rate to constant frame rate.

 

Then I figured I should probably have converted all my clips to CFR before the initial import.  So now I am going back and converting and replacing each one at a time.  However, there are a lot of clips.

 

Thoughts?  Recommended adjustments?

Translate
Report
Community guidelines
Be kind and respectful, give credit to the original source of content, and search for duplicates before posting. Learn more
community guidelines
Community Expert ,
Jul 02, 2023 Jul 02, 2023

Gotcha. 🙂

 

OK, it's a good learning experience. Check your edits while you go to make sure they are what you want, as the # of frames in each clip could change (slightly). 

Translate
Report
Community guidelines
Be kind and respectful, give credit to the original source of content, and search for duplicates before posting. Learn more
community guidelines
Participant ,
Jul 04, 2023 Jul 04, 2023

Thank you, that is helpful.  

 

Does the second part of my message make sense to you to do?  Given how time intensive it is to convert each and every clip from VFR to CFR, I'm wondering what the added value would be of doing so, and therefore whether it would justify the time spent.

Translate
Report
Community guidelines
Be kind and respectful, give credit to the original source of content, and search for duplicates before posting. Learn more
community guidelines
Community Expert ,
Jul 04, 2023 Jul 04, 2023
LATEST

If your project is done and 'ok' then no. But if you are doing it to start a project, then yes.

Translate
Report
Community guidelines
Be kind and respectful, give credit to the original source of content, and search for duplicates before posting. Learn more
community guidelines