• Global community
    • Language:
      • Deutsch
      • English
      • Español
      • Français
      • Português
  • 日本語コミュニティ
    Dedicated community for Japanese speakers
  • 한국 커뮤니티
    Dedicated community for Korean speakers
Exit
0

Why can't i just change time speeds in percentages like I need to?

Participant ,
Sep 13, 2018 Sep 13, 2018

Copy link to clipboard

Copied

The time remmaping works if you just are pulling and stretching randomly... but when i want to make key frames and fine tune speed changes it seems like After Effects is inadequate, even compared to Premiere which can change time by percentages of the original speed. The speed graph is a joke, Adobe should learn to make a graph in the first place before putting them all over their software... but non the less, it doesn't work anyway and Premiere is easier to use. Seems intention to me that Adobe likes to include some feature in one program but not include them in another.

Views

1.6K

Translate

Translate

Report

Report
Community guidelines
Be kind and respectful, give credit to the original source of content, and search for duplicates before posting. Learn more
community guidelines
Advisor ,
Sep 13, 2018 Sep 13, 2018

Copy link to clipboard

Copied

Right click on your layer > Time > Time stretch > enter a percentage in the Stretch factor field.

Votes

Translate

Translate

Report

Report
Community guidelines
Be kind and respectful, give credit to the original source of content, and search for duplicates before posting. Learn more
community guidelines
Community Expert ,
Sep 13, 2018 Sep 13, 2018

Copy link to clipboard

Copied

Time remapping can be precisely accurate if you learn how to work with the Graph Editor or just do a little math. The value graph gives you seconds and the speed graph gives you seconds/second. Here is an example that plays the first section at 2 seconds/second (double speed exactly) then takes precisely 25 frames to slow down to realtime of 1 second/second. You can't do that in Premiere Pro, not even close. Hovering over a keyframe gives you specifics.

Screenshot_2018-09-13 16.58.52_547qEJ.png

If you don't want to use Time Remapping then clicking on the third icon from the bottom left in the timeline gives you the same, if not better controls that you have in Premiere Pro that will allow you to stretch, set duration, or precisely change the in and out point time of a clip.

Screenshot_2018-09-13 17.06.27_QySYJE.png

gives you:

Screenshot_2018-09-13 17.06.48_fztarB.png

But personally, I think it's a lot easier to control the timing of a clip using Time Remapping and just paying attention to where you put the keyframes and how you move them. I'd say you have much greater control in AE than you do in Premiere Pro or any other NLE i have worked with. You just have to figure out how to understand what you are looking at. Most folks have a very hard time visualizing what is happening with time when they start bending it.

Votes

Translate

Translate

Report

Report
Community guidelines
Be kind and respectful, give credit to the original source of content, and search for duplicates before posting. Learn more
community guidelines
LEGEND ,
Sep 13, 2018 Sep 13, 2018

Copy link to clipboard

Copied

Premiere's speed for time interpolation is very nice. Ae is different - it gives you finer control but may seem less optimal for ramp changes in speed (because the clip does not automatically compensate for the change like in Pr).

you can use the Timewarp effect in Ae and you will get speed parameter same as premiere's and finer control of the interpolation between frames.

3rd party tools you may consider:

https://www.proloststore.com/products/speedramp
https://revisionfx.com/products/twixtor/

Votes

Translate

Translate

Report

Report
Community guidelines
Be kind and respectful, give credit to the original source of content, and search for duplicates before posting. Learn more
community guidelines
Explorer ,
Dec 12, 2020 Dec 12, 2020

Copy link to clipboard

Copied

LATEST

Timewarp warps the image terribly, and editing Time Remapping via the Speed Graph is unintuitive and stupid (unless someone can show me a concise and clear tutorial that shows how to slow footage down to 12.5% a 29.97fps composition using a 239.762 video source, and then work with easing nicely?).

 

There is no good option - another reason why I've moved to DaVinci Resolve (especially as it's a one-off cost).

Votes

Translate

Translate

Report

Report
Community guidelines
Be kind and respectful, give credit to the original source of content, and search for duplicates before posting. Learn more
community guidelines